Our heavy-lift team in Peru handled the transport of six large electric room modules along with various loose equipment and structures, using specialized multimax and low-bed trailers to handle these high-capacity loads. The heaviest module weighed 65,000 kg and measured 24.5 x 3.8 x 5.0 m
POL: Lima, Peru
POD: Antapaccay, Peru
Industry: Mining
Volume: 24.5 x 3.8 x 5.0 m
Bertling Team: Peru