Our colleagues excelled in loading heavy subsea equipment weighing up to 68 tons:
POL: Montrose, UK
POD: Abu Qir, Egypt
Industry: Oil & Gas
Volume: 5,92m x 4,83m x 5,11m
Bertling Team: UK
Our SOW included vessel chartering, safety measures, technical supervision and documentation. A particular challenge was finding a cost-effective and suitable tonnage for the project cargo to Egypt, coordinating and supervising the technical operations on board and liaising with the surveyors, crew and client.