Bertling recently coordinated the loading and transport of a Pedestal Crane Boom and Slewing Column from Gdynia Port, Poland to Jebel Ali, UAE.
POL: Gdynia Port, Poland
POD: Jebel Ali, UAE
Volume: Crane Boom: 54.6m (L) x 5.3m (W) x 4.7m (H), 57.4 tonnes (W) and Slewing Column: 9.2m (L) x 5.9m (W) x 8.3m (H) 55.5 tonnes (W)
Bertling Team: Bertling Middlesbrough
The operation was completed in just one day, involving vessel loading, securing, and sea fastening. Despite a last-minute scope change requiring tandem lifting via shore cranes, our technical team quickly adapted and provided revised lifting plans.
A big thank you to our Bertling Middlesbrough office and on-site technical crew for their fast turnaround, solid supervision, and engineering expertise.